PROSTIR FIX / PORTFOLIO
Spaces we have
worked on.
Commercial renovation photos in Kyiv: stairwell wall plastering at Khreshchatyk Plaza, preparation for decorative finishes and completed projects.
Consistent tonal presentation. The original is available in the viewer.
28 photos
Work in progressKhreshchatyk Plaza
Protecting stairs and handrails during wall preparation. Khreshchatyk Plaza business centre, Kyiv.
Work in progressKhreshchatyk Plaza
Preparing and levelling stairwell walls before applying a decorative finish. Khreshchatyk Plaza business centre, Kyiv.
Work in progressKhreshchatyk Plaza
Preparing the landing walls and ceiling: exposed substrate and work platforms. Khreshchatyk Plaza business centre, Kyiv.
Work in progressKhreshchatyk Plaza
Wall preparation in the business centre for painting and a silk-effect coating. Khreshchatyk Plaza business centre, Kyiv.
Work in progressKhreshchatyk Plaza
Preparing stairwell wall surfaces for a levelling coat. Khreshchatyk Plaza business centre, Kyiv.
Work in progressKhreshchatyk Plaza
Preparing the wall beside the window and cleaning the lower section for finishing. Khreshchatyk Plaza business centre, Kyiv.
Work in progressKhreshchatyk Plaza
Preparing walls around the doorway on the stair landing. Khreshchatyk Plaza business centre, Kyiv.
Work in progressKhreshchatyk Plaza
A tradesperson prepares the upper stairwell wall for a decorative coating. Khreshchatyk Plaza business centre, Kyiv.
Work in progressKhreshchatyk Plaza
Overview of the staircase during renovation and wall preparation. Khreshchatyk Plaza business centre, Kyiv.
Work in progressKhreshchatyk Plaza
Preparing the walls along the stairs with handrails protected by sheeting. Khreshchatyk Plaza business centre, Kyiv.
Work in progressKhreshchatyk Plaza
Walls along the stair flight during substrate cleaning and preparation. Khreshchatyk Plaza business centre, Kyiv.
Work in progressKhreshchatyk Plaza
Preparation for wall finishing beside the windows and glass stair railings. Khreshchatyk Plaza business centre, Kyiv.
Work in progressKhreshchatyk Plaza
Stairwell wall plastering: substrate preparation before levelling. Khreshchatyk Plaza business centre, Kyiv.
Work in progressKhreshchatyk Plaza
Cleaning landing walls and preparing sections for plastering. Khreshchatyk Plaza business centre, Kyiv.
Work in progressKhreshchatyk Plaza
Preparing walls above the stair flight for subsequent decorative finishing. Khreshchatyk Plaza business centre, Kyiv.
Work in progressKhreshchatyk Plaza
Staircase during renovation, with protected handrails and wall sections in progress. Khreshchatyk Plaza business centre, Kyiv.
ResultKhreshchatyk Plaza
Office area: painting, Armstrong ceiling, flooring and lighting
ResultKhreshchatyk Plaza
Corridor and offices: finishes, ceiling and floor covering
ResultKhreshchatyk Plaza
Office corridor: painting, Armstrong ceiling and flooring
Before workKhreshchatyk Plaza
Office space before refurbishment
ResultELITZOO
Sales floor: wall painting and tiling
ResultELITZOO
Overview of the sales floor: walls, flooring and lighting
Work in progressELITZOO
Painted walls and ventilation ducts
Work in progressELITZOO
Drywall walls being prepared for finishing
ResultAvtosoyuz
Drywall wall: painting, window and door installation
Work in progressAvtosoyuz
Installing the metal frame for a drywall wall
Work in progressAvtosoyuz
Preparing the drywall wall surface
Before workAvtosoyuz
The space before the new wall was installed
No photos match these filters. Try another combination.
06 / CONTACT
Ready to refresh
your space?
Tell us what needs repairing. We will agree the next step and the details needed for an estimate.
22/17 Konstantynivska Street, Kyiv
Open map Order / send photos on Telegram2215415@ukr.netKyiv and Kyiv region